
Conquering Today's Resource Plays
Xtreme Drilling and Coil Services is helping operators in major U.S. resource plays improve their well productivity with drilling performance that is establishing new industry benchmarks. Our rigs are purpose-built for deeper, faster, safer drilling from the Eagle Ford to the Greater Denver-Julesburg Basin to the Bakken.
Greater Efficiency, Safety and Flexibility
Xtreme operates one of the industry's newest fleets, with rigs outfitted from top to bottom with the technologies that today's unconventional shale plays demand. These advancements include AC drawworks, top drives and injectors, high-horsepower mud pumps, and innovative handling of jointed pipe and coiled tubing. Our rigs are also highly mobile, with multi-well skidding and modular transportation systems.
Highlights From Xtreme's Record-Setting History Include:
Drilled S-curve to 8,000 feet in 50.5 hours (Denver-Julesburg Basin, Colorado)
Took the top three places on RigData's list of land rigs drilling the most footage in the U.S. from 7/1/09 to 6/30/10
Drilled TD of 7,480 feet in 2.7 days, rig release to rig release (Rocky Mountains, Colorado)
Reached 9,954 feet with 3 1/2" coiled tubing (Mexico)
Drilled first well ever undertaken with coiled tubing in the Waddell Ranch field (West Texas)
Deepest S-curve well drilled with 3 1/2" coil and a rotary-steerable bottom hole assembly
In 51.25 rotating hours, drilled from below surface casing to TD of about 8,375 feet; this 7 7/8" hole is deepest well drilled with 3 1/2" coil (Denver-Julesburg Basin, Colorado)
Drilled spud to TD of 7,655 feet with continuous 3 1/2" coiled tubing string in 82.25 hours (Wattenberg Field, Denver-Julesburg Basin, Colorado)
Drilled to 8,125 feet with continuous 3 1/2" coiled tubing string (Wattenberg Field, Denver-Julesburg Basin, Colorado)
Drilled to 7,466 feet with 3 1/2" coiled tubing (Wattenberg Field, Denver-Julesburg Basin, Colorado)
Drilled 7 7/8" hole more than 6,000 feet with coil and RSS